Optimization period
The optimization period is the elapsed time between the earliest proposed contact and the latest proposed contact.
For example, if a PCT contains proposed contact dates between April 1 and April 30, the optimization period is 30 days long.
The optimization period is determined by the dates that are specified in the
Contact Date
field of the PCT. The
Contact Date
field is populated by the values in the Assignment tab of the Optimize process.
Copyright IBM Corporation 2013. All Rights Reserved.