In integrated IBM® Marketing Operations and
IBM® Campaign systems, campaign project templates can require
TCS® (target cell spreadsheet) approval before flowcharts run in production mode. If
Approval Required is selected on the template, then all rows of the
TCS® must to be approved before the flowchart can run in production mode. If you run the flowchart in production mode and one or more rows on the
TCS® associated with this flowchart are not approved,
Campaign generates an error.
If necessary, you can approve each row on a TCS® individually. You can approve rows as soon as they are complete and correct, even if other rows on the
TCS® are not yet ready to be approved.
If the project was created from a template on which the Approval Required check box is not selected, then approval is not required for top-down cells in the
TCS®. In this case, the
TCS® grid does not show the
approval column or
approve all and
deny all. Leaving the approval required check box cleared saves time if campaigns do not require
TCS® approval.
If Approval Required is selected, the
is approved column is included when you export the project.
If Approval Required is cleared, the
is approved column does not export, and only matching CSV files import.