Planning the Interact upgrade
Upgrade your installation of Interact after understanding the guidelines that are specific to your current version of Interact.
Use the following guidelines for upgrading Interact:
Install Interact 9.1 in a new location.
*
There is no upgrade path from Interact 5.x or 6.x to the latest version of Interact.
Use the Interact installer for both the design time environment and the runtime environment.
You must upgrade Campaign before you upgrade the Interact design time environment.
c.
Upgrade the reports package as explained in the IBM® EMM Reports Installation and Configuration Guide.
2.
Follow the instructions to upgrade any Interact version 8.5x or later to the new version.
Use the Interact installer for both the design time environment and the runtime environment.
*
You must upgrade Campaign before you upgrade the Interact design time environment.
3.
Upgrade the reports package as explained in the IBM® EMM Reports Installation and Configuration Guide.
Prerequisites
Upgrade prerequisites for all IBM EMM products
Interact upgrade tools
Interact upgrade worksheet
Information for creating JDBC connections