1.
|
In your IBM® Campaign flowchart, roll your cursor over the process box with the red X to view the error.
|
|
This information is also captured in the flowchart logs. In IBM® Campaign, make sure the log level is set to ALL.
|
2.
|
3.
|
|
In the SPSS Score process box, you can open multiple sessions, one for each modeling stream. Each modeling stream opens in its own window.
|
b.
|
4.
|
Copyright IBM Corporation 2015. All Rights Reserved.
|