1.
|
2.
|
4.
|
6.
|
|
If you added the Offer Valid/Expiration Dates attribute to the template as a parameterized attribute, on this screen you are presented with a radio box Flowchart run date. If you select this option instead of entering a default Offer Valid date, Campaign uses the date on which the process that uses the offer runs, not the entire flowchart.
|
8.
|
Copyright IBM Corporation 2015. All Rights Reserved.
|