1.
|
On the Schedule tab of the Schedule process configuration dialog, click Calendar. This button is only enabled if you have selected Custom Run from the Schedule to Run drop-down list.
|
|
Change the month, year, and time using the Month drop-down list
|
3.
|
Specify the time by entering the desired time in the Run Time field, using the format hh:mm, followed by an a.m. or p.m. designation.
|
4.
|
Click Apply to enter the specified date and time, leaving the Calendar window open, or click OK to enter the specified date and time and close the Calendar window.
|
Copyright IBM Corporation 2013. All Rights Reserved.
|