To select more than one package from a single Extract process
Use this method only if you are sure that the packages are mutually exclusive. This method also requires a custom field in your Contact Optimization template table.
For information about working with flowcharts, see to the IBM® Campaign User’s Guide.
1.
2.
3.
Follow instructions in To select the package that contains the optimized contacts, selecting all packages to be processed in the same post-optimization session.
4.
*
a.
b.
Click Add.
The field populates the Fields to Extract section.
5.
6.
7.
The Extract process runs and communicates information to the Segment process.
8.
a.
b.
Select Segment by Field.
c.
This field is the same field you selected in step 4.
d.
e.
Select the Create Extract tables check box.
f.
Complete the Extract tab by selecting the Target Data Source and the fields to include in the Extract table.
9.